Drill Tech Engineers Private Limited

Share:  


Home About Us Services We Offer Contact Us Enquiry

Services We Offer

Showcase

playstop





Home » About Us
About Us Projects

About Us

IN DEPTH EXPERTISE

People Don't Plan to fail, They fail to Plan. The Time is always right to do What is Right. Develop the wining edge, small diffrences in your performance can lead to large diffrents in your results. Hands untrained in the use of tools destroy what they want to build. it takes skill to use tools to achieve the result desired, weather it is tearing down an old house or building a new one. Skeptism is a tool serving both purposes. but it must be uses by a trained mind, a mind capable of disciplined thinking. Discipline is remembering what you want.


About Us

Company Profile

Basic Information
Business Type
  • Service Provider
Ownership & Capital
Year of Establishment1990
Ownership TypePrivate Limited Company
Trade & Market
Major Markets
  • Indian Subcontinent
Annual TurnoverUS$ 1-10 Million (or Rs. 4-40 Crore Approx.)
Team & Staff
Total Number of Employees101 to 500 People


ISO Certificate

We are an ISO 9001:2008 Certified company
ISO Certificate

Large view



Our Clients

Please click on the Download link below to view our clients.

download




Quality Policy

.
Quality Policy

Large view



Methodology of Piling

  • Survey the area & mark the pile points.

  • Bring the rig near pile point, Align tip of Auger with Pile Point using articulation & adjust vertically.

  • Pre-Bore @ 1m depth, place guide casing keeping pile point at centre & press by rotary. In case of longer casing it is placed in similar way.

  • Start Boring. Depending upon the material being bored Drill & take out musk. After boring to the desired depth clean the bore by using bucket.

  • After the boring is finished, lower the cage in the bore using a crane or auxiliary winch of the rig. Pour the concrete using tremie pipe up to the top of the bore.

  • Remove the temporary casing by crance/2nd winch.

 

Related Activities

  • Cages are made and kept ready while drilling is going on at site to save time.

  • Must is cleared from near the rig & taken away using a small loader.

  • It is insured that the concrete is available for pouring in the completed bore as soon as possible to enhance the productivity.

Tools

  • Clay / Soil Auger

      Auger for loose soils such as sand and gravel as well as for cohesive soils.

Methodology of Piling

Large view



Rock Auger

Full-face cutting tool for compact highly cohesive rock suitable for drilling. It is basicly used for drilling in Hard Rock.
Rock Auger

Large view



Buckets

For cleaning the bottom of barehole
Buckets

Large view



Use of Bentonite

  • Bentonite powder is mixed with water in required concentration in a big tank. Specific Gravity @ 1.02 with Mixer / Agitator.
  • This mixture is pumped in the bore while Drilling.
  • The bentonite mix comes out of bore during concreting which is sucked by Vertical Mud pump and is sent to Desander where the sand is removed from it. powder is mixed with water in required concentration in a big tank. Specific Gravity @ 1.02 with Mixer / Agitator.
  • Mix is sent back to the tank. bentonite powder in required quantity is added to the mix to maintain level of concentration before reusing while boring.
  • Bentonite particles are very fine & light which percolates fast in the earth & block the natural streams of water, hence it is considered environmentally hazardous especially in Agricultural / fertile land.
Use of Bentonite

Large view



Casings

  • Guide Casing
  • Temporary Casing
  • Permanent Casing
  • Insertion & Extraction of casings
  • - By Rotary - Extraction by which or crane
  • Casing Oscillator
  • Vibro Hammer
  • Casing Sections
  • Casing Shoes
  • Casing Joints
Casings

Large view



Concreting with Tremie Pipe

  • Trime Pipe
A Narrow steel pipe with hopper attached at the top end held by Crane / Service winch of Rig to pore concrete in to the bore. The tremie pipe has several sections screwed together to increase or reduce the length by adding or removing the sections according to the requirement.

The correct procedure of concreting of pile is to start pouring the concrete from the bottom of the bore up to the top.





Concreting with Tremie Pipe

Large view



SHORE PILE FOR LARSEN & TOUBRO LIMITED

.
SHORE PILE FOR LARSEN & TOUBRO LIMITED

Large view



Drilling at Site

.
Drilling at Site

Large view




Contact Us

Mr. Salauddin Shaikh / Amita Wagh (CEO)
No. 505 - B, Kanara Business Centre, Near Laxmi Nagar Bus Stop, Near Ghatkopar Depot, Ghatkopar East
Mumbai, Maharashtra - 400 075, India
Telephone:+(91)-(22)-25004921/ 25004922



Home  |  About Us  |  Services We Offer  |  Site Navigation  |   Contact Us   |  Enquiry

Member IndiaMART.com © Drill Tech Engineers Private Limited. All Rights Reserved (Terms of Use)
Developed and Managed by IndiaMART InterMESH Limited