ISI :Pawan Power & Telecom Ltd., is following strict process quality maintained at every stage of production, from purchasing of raw-materials to finish products.The following standards are followed for raw-material at the manufacturing stage / process IS:8139, IS:6474, IS:3975, IS:398, IASIMD:2863, IEC: 754-I, 339-I 540-I, SS:424-1475, IRS:63-83, 35-70 and IEEE:383, overall the wires, cables and Conductor confirming to their respective IS:
The responsibilities and authority of those in-charge of the quality system have been clearly established. These persons are independent from the pressure of production, and shall have access to top management.
Any change in raw materials and production related instructions are documented.
The minor deviation in performance characteristics of non-critical type are accepted provided other requirements of applicable specification are met with.
QUALITY CONTROL ACTIVITIES
The Q.C. Activities include :
a) Preparation of Documents :
- Preparation of guaranteed technical particulars
- Vendor rating
- Sampling Plans
- Production Instructions
b) Inspection and Testing of :
- Raw materials
- Production in Process
- Finished Products
c) Attend to :
- Complaints
- Inspection Agencies
DISPOSAL OF REJECTED MATERIALS
The rejected materials are sent by the production supervisor to the stores and the same are disposed off as scrap.
CHECK-ON QUALITY CONTROL EQUIPMENTS
The equipments are periodically checked and calibrated by independent labs.
PROCESS TO CHECK STAGE WISE:
Wire drawing stage
a) Diameter & Surface of single wires
b) Tensile Strength & wrapping test for Aluminium
Conductor
Annealing Stage
a) Percentage of Elongation test for copper
conductor
b) Conductor resistance
Stranding Stage
a) Diameter & surface of each wire
b) No. of wires as per specification.
c) Lay ratio
d) Diameter of conductor after stranding Height &
width if sector shape conductor
e) Resistance
PVC Insulation Stage
a) Thickness of insulation as per specification
b) Spark test
c) Physical check for core finish
Laid up stage
a) Direction of lay
b) Dia at laid up stage
c) Lay ratio
Inner Sheath Stage
a) Thickness on inner sheath
b) Diameter of cable over inner sheath
Armour Stage
a) Dimension / diameter of steel strips / steel wires
b) Direction of armouring
c) No. of wires / strips on cable
d) Diameter of cable over armour
Outer Sheath
a) Thickness of outer sheath
b) Overall diameter of cable
c) Embossing
d) Profile of cable