1) Everest Ind. Ltd., Roorkee, UT: Mfg., Supply, Dev., E & C Asbestos Plant, F.O., HSD, Process fluid, Vacuum, Steam & condensate recovery Systems and Industrial process pipings, Dense Phase Pneumatic conveying of cement, Dust collectors, Auto claves, Sup./E & C Material handling systems.
Project Duration: 8 Months Our Billing: 130 Lacs
2) Jindal Saw Pipes Ltd., Sinner: Turnkey execution of Production Lines approx. 300MT of Equipment Fabrication, Site Fab. of 500/100 KL Furnace Oil & HSD Storage Tks, Large chimney & Fume Ducts, Heavy duty Material Handling Systems, Industrial Pipings, Electrical Heat Tracing of F.O., Assembly of Production Equipment as per Drgs., Developments & Thermal Insulations.
Project Duration: 6 Months Our Billing: 45 Lacs
3) Marketing International, Mumbai: Plant & Project layouts, Development of Special Purpose Hydraulic & Pneumatically operated M/c, Detail Equipment Designing on CAD with P & I for Civil plant layout, Supply, Fab., Erection & Commissioning of equipments such as FRP Pipe M/c, Stiffness Testing, Tensile, Hydro Design Basis & End Chamfering M/c and other developments.
Project duration: 2 Months Our Billing: 22 Lacs
4) Carbon Ever Flow, Satpur: Turnkey execution, Mfg., Supply, Maintenance, Development, Erection & Commissioning of various equipments, 10 chimneys, 5 Thermic fluid heaters, 4 Hot Gas Generators, 6 Rotary Mixers, 4 Large Duty Dust Collectors, 100 Ft. Ht. Bucket Elevators, Heavy Duty Vibratory Screen, Very Large Thermic Fluid & Utility Systems, Industrial & Process piping with Proposed CAD Drgs., Ducting in MS & FRP, Thermal Insulations & Misc. Heavy Jobs.
Project Duration: 20 Months Our Billing: 45 Lacs
5) Eternit Everest Ltd., Dindori: Mfg, Sup., E&C of production lines for Asbestos Cement Corrugated Sheet, F.O., HSD, Process Fluid, Steam & Condensate Recovery Systems and Industrial Process Pipings, Steam Heat Tracing of F.O., Complete Utilities E&C, Dense Phase Pneumatic Conveying of Cement & Slurry Material Handling Systems, Process related developments and Energy Conservation jobs, FRP Lining & Thermal Insulations, Large Volume Storage Tanks, Heating & Curing Ovens.
Project Duration: 24 Months Our Billing: 95 Lacs
6) TI Cycles Ltd., Sinner: Turnkey Execution of Pressurised Hot Water & other equipments, Furnace Oil, HSD & Pneumatic Systems, Industrial Pipings in MS, HDPE, Under ground Large Solvent Tanks with Pumping Systems, Chimney, Pickling Tank Lead Lining, Acid & Alkali Proof FRP Laminations, PP Ducts, E&C of Equipments & Thermal Insulations.
Project Duration: 6 Months Our Billing: 25 Lacs
7) Satyen Polymers, Silvassa: E&C Polyester Resin Process Plant, Reactors, Distillation Column, Large Thermic Fluid Heating Systems, Solvent, Process & Utilities & Cooling Tower installation,SS, HDPE & MS pipings, Chimney, Ducts, SS & MS Pipings & Pumping Stations, Maint., Development & Fabrications.
Project Duration: 2 Months Our Billing: 30 Lacs
8) Trambak Rubber, Musalgaon: Turnkey execution, Civil, E&C Rubber Extruder, Intermix, Mills, Kneaders, Splicers, Curing & SPM M/c, Utilities, Chimneys, Ductings, O/H Gantries, Tanks, Pipings, Conveyors, Storage vessels, Thermal Insulations, Maintenance & Development.
Project Duration: 3 Months Our Billing: 45 Lac
| |