Aluminum Plant![]() Brief of Engagement • To improve availability of Bliss Mill to 95% plus from the present level that varies between 80% to 90% and improve the productivity of the hundred year old mill by at least 10% Results • Availability rose to 95% in less than 6 months. Productivity increased by 25% and power consumption decreased by 17% Cement Company![]() Engagement One – We aimed at reducing the dangerously high levels of vibration (around 5000 microns) of Cement Mill to less than 1000 microns so that various product blends could be produced. Results Achieved:
Engagement Two – To bring improvement in plant availability from 289 days to 320 days within one year. Result Achieved:
Chemical Company![]() Engagement One –
Here, our aim was to reduce breakdown of critical machines from level of 24 failures a month to as low as possible. Further, we also aimed towards identifying weak areas that would not sustain stress of running the facility to around 120% of its capacity.
Results Achieved:
Engagement Two –
Here, the need was to redesign existing machine so as to obtain productivity gain of around 50% as well as reduce maintenance time and effort. Further, we also aimed at building the machine locally at less than 10% of price which would otherwise have to be paid if machine was imported.
Result Achieved:
Manufacturing Plant![]() Brief of Engagement • Improve availability of machines from the present level of 80% to 100% in six months' time. • Improve the function of the machine so that the quality of the output is within 6sigma Results • Availability increased to more than 100% in less than 6 months. • A grinding machine relegated to rough finishing could now be used for final finishing and added 31 more gears to the total production. This could be achieved in less than 1 month's effort. • Quality output is now within 6 sigma limit within 6 months for gear grinding machines. Oil Company![]() Engagement –
We wanted to reduce dangerous vibration of refrigerant screw compressors from 28 mm/s to 2.5 mm/s.
Result Achieved:
Plastic Company![]() Engagement –
We aimed at increasing the productivity by 2 times in 6 months time & then by 3 times in 1.5 years.
Results Achieved:
Rubber Company![]() Brief of Engagement • Total organizational change - from Operational and functional strategy, structure, operational performance • How to increase productivity by 3 times within three years • Achieve a delivery commitment of 90% within one year Results • Productivity improved by 2 times in less than 8 months • Delivery commitment has improved to 95% in less than 9 months time i.e. a delivery backlog from 11 months delay reduced to delivery within 17 days from placement of orders for 80% of the orders Steel Company![]() Engagement One – We planned to increase yield of continuous pig casting machine to 97% from a level of 92 to 93%. Further, we also wanted to decrease quality defects to zero as well as improve availability to 100% & functional accuracy to 100%. Results Achieved:
Engagement Two –
To increase plant availability from 90% to 98% in two years’ time.