About Us


Sitemap

Industrial Signature Projects

We are offering Industrial Signature Project Services. Our Reliability, Availability as well as Performance Enhancement Engagements are our signature projects. Some of the areas that were handled by us under this include Chemical plants, Cement plants, Steel plants, oil plants and plastic companies.

The work details include:


Aluminum Plant

Aluminum Plant
Brief of Engagement • To improve availability of Bliss Mill to 95% plus from the present level that varies between 80% to 90% and improve the productivity of the hundred year old mill by at least 10% Results • Availability rose to 95% in less than 6 months. Productivity increased by 25% and power consumption decreased by 17%

 
 

Cement Company

Cement Company
Engagement One –

We aimed at reducing the dangerously high levels of vibration (around 5000 microns) of Cement Mill to less than 1000 microns so that various product blends could be produced.

Results Achieved:

  • Vibrations reduced to around 500 microns

Engagement Two –

To bring improvement in plant availability from 289 days to 320 days within one year.

Result Achieved:

  • Plant availability improved to 330 days within one year


 
 

Chemical Company

Chemical Company
Engagement One –

 

Here, our aim was to reduce breakdown of critical machines from level of 24 failures a month to as low as possible. Further, we also aimed towards identifying weak areas that would not sustain stress of running the facility to around 120% of its capacity.

 

Results Achieved:

  • Failures reduced from 24 failures a month to 1 failure a year for 36 identified critical machines
  • The plant runs at 129% of its designed capacity

 

Engagement Two –

 

Here, the need was to redesign existing machine so as to obtain productivity gain of around 50% as well as reduce maintenance time and effort. Further, we also aimed at building the machine locally at less than 10% of price which would otherwise have to be paid if machine was imported.

 

Result Achieved:

  • All objectives of engagement were achieved within 6 months of start of the project

 
 

Manufacturing Plant

Manufacturing Plant
Brief of Engagement • Improve availability of machines from the present level of 80% to 100% in six months' time. • Improve the function of the machine so that the quality of the output is within 6sigma Results • Availability increased to more than 100% in less than 6 months. • A grinding machine relegated to rough finishing could now be used for final finishing and added 31 more gears to the total production. This could be achieved in less than 1 month's effort. • Quality output is now within 6 sigma limit within 6 months for gear grinding machines.

 
 

Oil Company

Oil Company
Engagement –

 

We wanted to reduce dangerous vibration of refrigerant screw compressors from 28 mm/s to 2.5 mm/s.

 

Result Achieved:

  • Results achieved within three months after implementation of the solutions


 
 

Plastic Company

Plastic Company
Engagement –

 

We aimed at increasing the productivity by 2 times in 6 months time & then by 3 times in 1.5 years.

 

Results Achieved:

  • Productivity increased by 2 times within the first six months
  • By ninth month, productivity increased by 3 times

 
 

Rubber Company

Rubber Company
Brief of Engagement • Total organizational change - from Operational and functional strategy, structure, operational performance • How to increase productivity by 3 times within three years • Achieve a delivery commitment of 90% within one year Results • Productivity improved by 2 times in less than 8 months • Delivery commitment has improved to 95% in less than 9 months time i.e. a delivery backlog from 11 months delay reduced to delivery within 17 days from placement of orders for 80% of the orders

 
 

Steel Company

Steel Company
Engagement One –

We planned to increase yield of continuous pig casting machine to 97% from a level of 92 to 93%. Further, we also wanted to decrease quality defects to zero as well as improve availability to 100% & functional accuracy to 100%.

Results Achieved:

  • Yield increased to 98% plus in less than 5 months
  • Quality defects reduced to almost zero in less than 12 months
  • Percentage of poor pigs reduced by 70%
  • Availability to 100% & functional accuracy to 100% within 9 months

 

Engagement Two –

 

To increase plant availability from 90% to 98% in two years’ time.

 

Result Achieved:

  • Plant availability improved to 98% in two years’ time


 
 

 

Related Product Catalogs
RP Goel & Company
Offering business consulting services which includes business consulting service, corporate business consulting service, payroll services, preparation of ownership return and preparation of annual return.

View more details

Rahul Bhardwaj & Co.
Engaged in offering business consultancy, management consultancy, legal consultancy along taxation services, recovery solutions, corporate solutions, legal services, data entry services and asset reconstruction management services.

View more details

B. Chaudhury Print & Art Services Private Limited
Providing services which includes business planning services, research business planning services, management consultants services, business management services, business consultants services and research consultants services.

View more details

Suggested Companies


Related Categories
Search Suppliers
CompanyProductsTrade Leads
OR


IndiaMARTCompaniesProductsTrade LeadsTendersTrade ShowsTravel
© 1996-2012 IndiaMART InterMESH Limited. All rights reserved worldwide.