We offer a qualitative range of scaffoldings that are extensively used in the construction industry. Manufactured using graded material, these are known for their high strength, corrosion resistance and better durability standards. Sturdy in construction, these scaffoldings are available in different sizes and specifications to suit the diverse requirements of clients.
|
 
H Shaped ScaffoldingsConsists of 40 NB/50 vertical Pipes welded together in the form of a frame. These frames are connected together by means of scissor cross braces. |  |
 
Tubes and FittingsAll fitting confirm to IS 2750: 1968. steel scaffold tubes are 40 NB,conforming to IS: 1239 or IS:1161, supplied in maximum length of 6 mts.
|  |
 
Cuplock ScaffoldingsThe principal feature of cuplock is its unique method of connecting ledgers and transoms to the vertical in one single action without the use of nuts, bolts and wedges. |  |
 
APU ScaffoldingsConsists of two vertical and one horizontal both of 40 NB tube. On vertical lugs welded at 500 mm c/c provide rigid support to horizontals which have built in three way clamps welded at both ends. |  |
 
Concrete HardwareOur clients can avail from us a comprehensive range of Concrete Hardware that are provided with safety features. These products are designed using premium quality Polymer to ensure, durability, firm grip and resistance to slip.
|  |
 
Base PlatesAdjustable base or head plate gives adjustment between 45mm to 550 mm |  |
 
Fork HeadsAdjustable Stirrup/ fork head gives adjustment between 45 mm to 550 mm |  |
 
Adjustable Telescopic Props | | Height Closed (m) | Height extended (m) | Safe axial load Closed (Kg) | Safe axial load Extended (Kg) | | 0P | 1.1 | 1.75 | 3500 | 3000 | | 1P | 1.5 | 2.75 | 3200 | 3200 | | 2P | 2 | 3.25 | 3000 | 2200 | | 3P | 2 | 3.75 | 2900 | 2000 | | 4P | 3 | 4.65 | 2300 | 1150 | |  |
 
Floor / Slab FormsMnaufactured out of 14 gauge sheets with pressed flanges and stiffeners made with width of 60 cm and length of 90 cm and 115 cm. Adjuster slab forms cover up the balance area, thus eliminating wastage and cutting altogether. |  |
 
Quick Strip SystemQuick strip system is a modern form system for the construction of RCC Floors.This system with the help of a component called DROP HEAD enables deshuttering after 3 days of concreting leaving below undisturbed below floor. |  |
|