Maintenance Service
| Capacity | 100 TR |
| Type | Air-Cooled |
| Size | Large |
| Power Source | Electric |
| Refrigerant Used | 407c |
Chiller service
View Complete Details
| Service Type | Preventive Maintenance |
| Chiller Type | Screw Chiller |
| Service Location | Tamilnadu |
Hanbell chiller maintenance
Key Overhauling Procedures
Preparation & Safety: Isolate the unit electrically and pneumatically, vent system pressure, and allow to cool.
Disassembly: Remove intake filters, oil separator, and piping. Unbolt and remove the airend (screw assembly).
Rotor Inspection: Inspect helical screws for wear, scoring, or debris.
Bearing/Seal Replacement: Replace rotor bearings and shaft seals to maintain tight clearances.
Cleaning & Reassembly: Clean all components, check clearances, and reassemble using proper torque settings.
Final Checks: Change oil, air filters, and oil separator filter, then check for leaks and proper vibration levels.
Additional Information:
- Delivery Time: one day
View Complete Details
| Chiller Type | Water Cooled Chiller |
Chiller Shell and Tube condenser & cooler Descaling
View Complete Details
- Developed and Managed by IndiaMART InterMESH Limited





















