X

Edge Electrics Private Limited

Toli Chowki, Hyderabad, Telangana

| GST  36AADCE8912B2ZW

| TrustSEAL Verified

|

★★★★★
★★★★★
View Mobile Number 80% Response Rate

Motor Conditioning Services

Offering you a complete choice of services which include Power Quality Audits Services, Safety Audits Services, Capacitors AMC Services, Data Centre Audits and Harmonic Audits Services.

Power Quality Audits Services
Interested in this product?
Get Best Quote

Power Quality Audits Services

Rs 10,000 / DayGet Latest Price

Usage/ApplicationAll Industrial ,Office and Corporate,Residential Clients
Type Of LoadAny Type of Load
Reason For AuditMaintenance Audit
Audit TypeElectrical Audit
Mode Of ReportSoft Copy
Audit FrequencyYearly
Locationglobal

Power quality studies is the set of limits of electrical properties that allows electrical systems to function in their intended manner without significant loss of performance or life. While “power quality” is a convenient term for many, it is the quality of the voltage rather than power or electric current that is actually described by the term. Power is simply the flow of energy and the current demanded by a load is largely uncontrollable. PQ is a measure which defines the ability of a system to support reliable operations of its load. Team Edge Technologies has the state of art high end 3 phase power quality analyzers to monitor and detect the issues relating to power quality.


We at Edge Technologies:

  • Predict the problems before they translate into major failures.
  • Analyze and troubleshoot the problem
  • Evaluate the performance of protection systems
  • Evaluate the efficiency of energy saving equipment
  • Study load behavior to enhance expansion possibilities.

View Complete Details

Yes, I am interested!

Safety Audits Services
Interested in this product?
Get Best Quote

Safety Audits Services

Rs 10,000 / DayGet Latest Price

Service Duration24 Hours Available
Service LocationWorld Wide
Service ModeOffline

Safety Audit is management tool comprising of a systematic, periodic and objective evaluation of how well the safety organization, management and equipment are performing, with the aim of helps to safeguard a company’s assets by facilitating management control of safety, health and environmental practices and assessing compliance with established standards.

Audits Objectives:
  • Verify compliance with established standards (regulations, internal policies and industry wise standards of practice )
  • Identify deviation from designed and planned operating and maintenance procedure and standards
  • Identify plant condition or operating procedures that could lead to an accident and significant losses to life or property
  • Ensure that the plan and operating and maintenance procedures match the design intent and standards
  • Keep the operating personnel alert to the process hazards & Review operating procedures for necessary revisions
  • Seek to identify equipment or process changes that could have introduced new hazards
  • Ultimate application of new technology to existing hazards & Review adequacy of safety inspections
  • Look for major risk situations recommend measures to improve overall safety performance of the plant

Electrical Safety Audit:
  • Goals of Team Edge Technologies in Safety Audit are Identifying potential electrical hazards to prevent or minimize loss of life and property by electrical causes such as short circuits, overloading, loose electrical connections etc
  • To identify potential electrical hazards, flaws in design system, maintenance system, etc.

 

Team Edge Process Flow:

  • Defining scope of Electrical Safety audit based on the specific requirement.
  • Physical inspection of the plant.
  • Reviewing the role of electrical safety in the total safety system.
  • Review of protection devices / system of the electrical installation.
  • Review of adequacy of cables, motors, etc.
  • Based on actual load current measurements and cable current carrying capacities.
  • Examination of adequacy of plant lightning protection system as per national and international standards to suggest recommendations as per applicable standards.
  • Review of the hazardous area Review of electrical accidents to identify root cause of the accidents.
  • Review the EPM (Electrical Preventive Maintenance) programme in the plant and to examine the documentation, checklists, work permit.

View Complete Details

Yes, I am interested!

Capacitors AMC Services
Interested in this product?
Get Best Quote

Capacitors AMC Services

Rs 10,000 / DayGet Latest Price

Type Of MaintenanceComprehensive and Non Comprehensive
Service ModeOffline
Mode Of RepairingDepends on Site and Warranty
Rental DurationYearly
Provide AmcComprehensive and Non Comprehensive
Usage/ApplicationCapacito,Capacitor Panels,PCC,MCC Panels
Service LocationWorld Wide
On-Site Service AvailableYes
BrandEDGE
Service Duration24 Hours Available

We undertake Preventive maintenence Comprehensive & Non Comprehensive AMC’s for:

  • Capacitors
  • Auto Power Factor Controllers
  • Thyristorized
  • Electromechanical
  • Active Harmonic Filters

View Complete Details

Yes, I am interested!

Data Centre Audits
Interested in this product?
Get Best Quote

Data Centre Audits

Rs 50,000 / NumberGet Latest Price

Service LocationWorld Wide
Service Duration24 Hours Available

The DCA (Data Centre Audit) Program is a half-day audit of your data centre, during which an EDGETM expert in data centre design and operations compares your infrastructure against more than 50 industry best practices, and identifies your overall risks and capacity challenges. It entails data centre inspection and data collection covering the following facility, racks and cabling, cooling, power, monitoring systems and service practices. It also includes general data centre characteristics and maintenance practices. The site check-up provides: Performance relative to 50+ best practices in five categories: Cooling, Power, Monitoring, Service, General Facility & Security .Snapshot of data centre health including capacity utilization statistics and opportunities to improve availability and efficiency. EDGE expert’s observations and recommendations. The service will provide you with a comprehensive report summarizing findings and observations. It will also determine how your data centre fares in terms of compliance with industry best practices. The report will also contain Emerson recommendations, together with implementation challenges and cost implications.

View Complete Details

Yes, I am interested!

Harmonic Audits Services
  • Harmonic Audits Services
  • Harmonic Audits Services
  • Harmonic Audits Services
  • Harmonic Audits Services
Interested in this product?
Get Best Quote

Harmonic Audits Services

Rs 10,000 / DayGet Latest Price

Service Duration24 Hours Available
Service LocationWorld Wide
Service ModeOffline

As more and more industries opt for process automation to increase control over operations and save on energy, the use of electronic equipment has also increased simultaneously, The use of devices such as variable speed drives, rectifiers, and energy savers cause harmonics and transients in the network – thus defeating their very purpose of energy efficiency. Modern industries require automation of their operation enabling them to produce quality products and also for mass production. The conventional systems are being replaced by modern Power Electronic systems, bringing a variety of advantages to the users. Classic examples are DC & AC Drives, UPS, soft starters, etc. Since the Thyristor converter technology is rapidly gaining ground in the modern industrial plants, the power supply systems are contaminated as the ideal sinusoidal current and voltage waveforms are getting distorted. This in turn is affecting the performance of the equipment in the electrical network.

 

Symptoms of Harmonics Studies

  • Blinking of incandescent bulbs
  •  Capacitor failure.
  •  Circuit breaker tripping.
  •  Computer malfunction or lockup.
  •  Conductor failure.
  •  Failure of electronic equipment.
  •  Flickering of fluorescent tubes.
  •  Blown fuses.
  •  Motor failures due to overheating.
  •  Excessive neutral current.
  •  Overheating of metal enclosures.
  •  Power interference on voice communication
  •  Transformer failure /Temperature Rise.
  •  Buss bar Humming.
  •  Cable Heating.


Effects of Harmonics:

  • Increased losses and temperature rise in Cables & Transformers.
  • Resonance between inductance and capacitance of the network resulting in amplification of harmonic currents in the network.
  • Accuracy of measuring instruments and protection relays affected
  • Communication signals distorted. Increase in Eddy Current and
  • Hysteresis Losses. Increase in Noise level of Audio equipment. Buss Bar Humming Noise.
  • Increase in neutral currents.
  • Neutral conductor and terminal failures.
  • Failure of electromagnetic loads.
  • Cards Failure


Our Approach:

  • Detect Harmonics in the network.
  • Identification of type of harmonics, amplitude of distortion and percentage of I-THD and V-THD.
  • Provide technical Specifications for Harmonic Filters.
    Supply, installation assistance and commissioning of filters.
  • Performance evaluation of filters and benefits after installation if done by us.
  • Provide KVAR Calculation at various levels.
  • Measure neutral to earth voltages.
  • Demand management.
  • TEAM EDGE Technologies with their High End 3 Phase Power Quality Analyzers measures harmonics but also give concrete Solutions to the problems found.

 

View Complete Details

Yes, I am interested!
© Edge Electrics Private Limited. All Rights Reserved (Terms of Use)