How it Works
Tell us what you need by filling in the form
Receive Verified supplier details
Compare Quotations and seal the deal
X
I agree to the terms and privacy policy
144188195215245280

Home

> Architecture & Interiors

> Building and Flooring Services

> Kalpana Struct-Con Private Limited

Kalpana Struct-Con Private Limited

Navi Mumbai, Maharashtra

| GST  27AAACK5108Q1Z8

| Verified Supplier

View Mobile Number

Provider of type v-e residential building, el castillo-residential building construction, construction of balance work of 48 flats etc....Read More

Type V-E Residential Building
Get Best Quote
  • Client: Department of Atomic Energy
  • Built-up Area: 70,842 Sq.Ft.
  • Cost: 1,056.00 Lacs
  • Duration: 23/04/2007 – 22/11/2008
  • Location: Mumbai
  • Architect: Department of Atomic Energy
  • Structural Consultant: Department of Atomic Energy
  • The work consisted of Stilt + 5 upper floor type V- E Buildings. The work involved all civil works with exclusive finishing works & allied works such as PH work, electrification, LAN System, Road works.

View Complete Details

Yes I'm interested

Residential Building Construction
Get Best Quote
  • Client: Akshar Accommodation Pvt. Ltd.
  • Built-up Area: 1,97,600 Sq.Ft
  • Cost: 2,568.80 Lacs
  • Duration: 01/09/2008 – 31/03/2010
  • Location: Navi Mumbai
  • Architect: M/s Dimension
  • Structural Consultant: Dr. B L Agarwal
  • The work consisted of Basement + Ground + 27 floors building. The total 18 flats having area of each flat 4500 Sq.Ft to 7500 Sq.Ft. The building consist of one flat per floor and duplex flats from the 14th floor with individual swimming pool in all duplex flats.

View Complete Details

Yes I'm interested

Slum Rehabilitation Buildings Construction
Get Best Quote
  • Client: Natvar Parikh & Co. Pvt. Ltd. - MMRDA Project
  • Built-up Area: 2,15,250 Sq.Ft.
  • Cost: 746.92 Lacs
  • Duration: 15/10/2003 – 14/01/2005
  • Location: Mumbai
  • The work consisted of G+7 storied – 6 bldg. for slum rehabilitation and completed within 14 months in all respects. The cost of work is excluding cost of steel and cement. The work involved complete civil works, PH works, electrifications, elevators etc.

View Complete Details

Yes I'm interested

Lig Type Tenements 352 Nos Construction
Get Best Quote
  • Client: CIDCO of Maharashtra Ltd
  • Built-up Area: 84,600 Sq,Ft,
  • Cost: 409.35 Lacs
  • Duration: 17/12/1999 – 16/12/2000
  • Location: Aurangabad
  • Architect: Architects Cidco Department

    This work consisted of 352 Nos. T/s under LIG Scheme including water supply and area development work. It was completed within 11 months instead of 12 months as stipulated in the tender.

View Complete Details

Yes I'm interested

Residential Flats Building
Get Best Quote
  • Client: Department of Atomic Energy
  • Built-up Area: 1,90,814 Sq.Ft.
  • Cost: 862.28 Lacs
  • Duration: 23/07/1999 – 22/11/2001
  • Location: Mumbai
  • Architect: Department of Atomic Energy
  • Structural Consultant: Department of Atomic Energy

    The residential building having Ground + 17 floors was our prestigious project for DAE. The building having 2 wings to accommodate 100 flats with modern amenities.

View Complete Details

Yes I'm interested

Opg Chs Residential Building Construction
Get Best Quote
  • Client: OPG Co.op Hsg. Society Ltd.
  • Built-up Area: 71,042 Sq.Ft.
  • Cost: 798.15 Lacs
  • Duration: 05/07/1995 – 04/06/1997
  • Location: Navi Mumbai
  • Architect: Anil Sule & Associates
  • Structural Consultant: Dasgupta & associates

The building consisted of Stilt+11 floors and it has a miniature elevation treatment like curved balconies, projection curved in plan as well as in elevation. It has decorative arches at 5th floor level spanning 15 met. suspended from beam of size 850×1350 mm. The exterior up to fourth and fifth floor is finished with SHON tiles.

 

View Complete Details

Yes I'm interested

Faculty Housing Building Construction
Get Best Quote
  • Client: Indian Institute of Technology Bombay
  • Built-up Area: 1,37,030 Sq.F
  • Cost: 2649.6 Lacs
  • Duration: 11/02/2010 – 10/08/2011
  • Location: Mumbai
  • Architect: Hafeez Contractor
  • Structural Consultant: Dongre Associates

The work consists Stilt + 16 floors having 60 flats. The work involves civil works with internal services like water supply, sewage disposal, internal and external electrifications, Fire Fighting and fire Alarm system, Elevators etc.

 

View Complete Details

Yes I'm interested

Convention Center Construction
Get Best Quote
  • Client: Indian Institute of Technology Bombay
  • Built-up Area:
  • Cost: 305.19 Lacs
  • Duration: 24/10/2009 – 23/09/2010
  • Location: Mumbai
  • Architect: Hafeez Contractor

The work involved is Civil works, RCC Canopy, Structural Steel for fins, Aluminum Composite Panel for fins, RENOVA Painting work.

View Complete Details

Yes I'm interested

Hostel Building Construction
Get Best Quote
  • Client: Indian Institute of Technology Bombay
  • Built-up Area: 1,93,257 Sq.Ft.
  • Cost: 4,374.76 Lacs
  • Duration: 28/04/2009 – 27/07/2010
  • Location: Mumbai
  • Architect: Hafeez Contractor
  • Structural Consultant: Mahimtura Consultants Pvt. Ltd.

The work have been completed with extra ordinary rate of progress. The work is completed with amounting Rs.4374.76 Lakhs one month prior to stipulated date of completion inspite of increase in the scope of work. The work consists 4 Buildings of G+7storyed Hostel building with 784 rooms. The work involved Civil works with PH works, Fire Fighting system, Fire Alarm System, Internal & External electrification, LAN System, Elevators.

View Complete Details

Yes I'm interested

Sports Complex Construction
Get Best Quote

· Client: Public Work Division

· Built-up Area: 12 Ac

· Cost: 297.00 Lacs

· Duration: 01/02/1999 – 31/07/2000

· Location: Maharashtra

The work consists Swimming Pool, filtration plant, running track, rest house, changing room, hostel building etc. The result – a well-designed and spacious sports complex with facilities to conduct different kinds of sports was completed within 18 months in all respects.

View Complete Details

Yes I'm interested

District Court Building Construction
Get Best Quote

  • Client: CIDCO of Maharashtra Ltd
  • Built-up Area: 42,196 Sq,Ft.
  • Cost: 331.46
  • Duration: 15/02/1993 – 14/02/1995
  • Location: Sindhudurg
  • Architect: M/s Kavinda Roy & Chowdhari

It has exceptional Architectural features specially designed by internationally recognized Architects M/s Kavinda Roy & Chowdhari, New Delhi. The structure appears as a balance weigh when observed from a distance. There are attractive slopping works and the walls are cladded with Glass mosaic tiles.

View Complete Details

Yes I'm interested

Bridges Construction
Get Best Quote

Bridges Construction

Get Latest Price

  • Client: CIDCO of Maharashtra Ltd
  • Built-up Area: --
  • Cost: 205 Lacs
  • Duration: 01/12/1995 – 15/01/1997
  • Location: Sindhudurg
  • Architect: --
  • Structural Consultant: --

This was a challenging task as this was first bridge work awarded to us. We have accepted the challenge and the work was completed within 13 months instead of 24 months as stipulated in the contract.

View Complete Details

Yes I'm interested

Shah Signature Commercial Building Construction
Get Best Quote
  • Client: Shah Group Builders & Infraprojects Ltd.
  • Built-up Area: 1,38,000 Sq.Ft.
  • Cost: 2387.40 lacs
  • Duration: 02/02/2012 – 30/04/2013
  • Location: Navi Mumbai
  • Architect: The Firm
  • Structural Consultant: Sanghavi & Associates

The work consists Ground + 21 floors commercial building that includes Shops at Ground & 1st Floor, Parking from 2nd to 5th level and offices above 5th level.

View Complete Details

Yes I'm interested

Cyber One Commercial Building Construction
Get Best Quote
  • Client: Greenscape Developers Pvt. Ltd.
  • Built-up Area: 4,15,018 Sq.Ft.
  • Cost: 4021.52 Lacs
  • Duration: 01/09/2010 – 31/06/12
  • Location: Navi Mumbai
  • Architect: Soyuz Talib

The work consisted of Ground + 24 floor commercial building for Information Technology purpose. The work involves Pre-cast piling of dia 600 to 1000 mm dia by using MS liner. The building having parking upto 7th level.

View Complete Details

Yes I'm interested

Agri Koli Bhavan Construction
Get Best Quote
  • Client: CIDCO of Maharashtra Ltd
  • Built-up Area: 59,265 Sq.Ft.
  • Cost: 2,457.48 Lacs
  • Duration: 12/03/2009 – 25/01/2011
  • Location: Navi Mumbai
  • Architect: Architects Cidco Department

The work consists G+3 storied structure having large stilt area, Museum, Multipurpose hall & Auditorium. The scope of work involved pre cast pre-bored pile foundation, all civil works, exclusive interior finishes, False Ceiling, ACP Cladding, structural glazing, structural steel work for CRiL Riverclack Roofing & Polycarbonate Roofing, Tensile Fabrics, Sanitary & Plumbing, Fire Fighting system, Internal & External Electrifications, HVAC System and Elevators.

 

View Complete Details

Yes I'm interested

Aerb Annexe Building Construction
Get Best Quote
  • Client: Department of Atomic Energy
  • Built-up Area: 48,950 Sq.Ft.
  • Cost: 449.01 Lacs
  • Duration: 25/11/2004 – 24/10/2006
  • Location: Mumbai

The work consisted of G+5 Storied office Building. All the concrete was done with Ready Mix Concrete with specialized items such as Metal False Ceiling, Synthetic Plaster etc

View Complete Details

Yes I'm interested

Guest House Construction
Get Best Quote

Guest House Construction

Get Latest Price

  • Client: Power Grid Corporation of India Ltd.
  • Built-up Area: 22,265 Sq.Ft.
  • Cost: 86.90 Lacs
  • Duration: 26/04/2001 – 25/01/2002
  • Location: GOA

This work consisted of G+2 structure of Guest House Building including interior extra ordinary finishing work with electrification, fountain etc. work. The cost of work is excluding steel and cement.

View Complete Details

Yes I'm interested

Yugandhara Residential Commercial Building Construction
Get Best Quote

  • Client: Kalpana Struct – Con Pvt. Ltd.
  • Built-up Area: 90,834 Sq.Ft.
  • Cost: 1,212.00 Lacs
  • Duration: 24/09/2004 – 31/03/2007
  • Location: Navi Mumbai
  • Architect: Milind Pawar

This work is our own Building as a Developer. The total 40 flats having 2 & 3 BHK with 17 Shops and Hostel Building at first floor. The work involved Precast pre bored pile foundation, Civil works, exclusive interior finishes, PH work, Fire Fighting system, Internal & External Electrification, lifts, landscape etc. We have handover the possession of buyers before committed time limit.

View Complete Details

Yes I'm interested

Meera Chs Residential Commercial Building
Get Best Quote

  • Client: Meera Co-op Hsg. Society Ltd. IS & IPS Officers
  • Built-up Area: 2,38,799 Sq.Ft.
  • Cost: 2790.00 Lacs
  • Duration: 25/11/2002 – 31/12/2004
  • Location: Mumbai

The residential cum commercial building having (Ground + Podium + 18 floors ) was our prestigious mega project for MEERA Co- op Housing Society Ltd of IS and IPS officers of Maharashtra state. The building having 3 wings to accommodate 100 flats with modern amenities like swimming pool at Podium level, health club, structural cladding, Aluminum composite panel etc.

View Complete Details

Yes I'm interested

Efficiency Apartments Construction
Get Best Quote
  • Client: Department of Atomic Energy
  • Built-up Area: 1,45,917 Sq,Ft.
  • Cost: 637.46 Lacs
  • Duration: 23/03/1999 – 22/07/2000
  • Location: Mumbai
  • Architect: Department of Atomic Energy
  • Structural Consultant: Department of Atomic Energy

    This Stilt + 12 storied Building having 132 flats with BUA 14500 Sqm. is completed within 16 months in all respects. For all beams and Slabs of this work only Ready Mix Concrete was used and the approx. quantity of RMC was 2700 Cum

View Complete Details

Yes I'm interested

48 Flats Construction

Get Latest Price

  • Client: Department of Atomic Energy
  • Built-up Area: 38,300 Sq.Ft.
  • Cost: 291.66 Lacs
  • Duration: 04/03/2008 – 31/01/2009
  • Location: Mumbai
  • Architect: Department of Atomic Energy
  • Structural Consultant: Department of Atomic Energy

    The work consists Type -III -C Ground +3 upper floors in two blocks having total 48 flats. The major work involves is finishing, area development & Electrification works.

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: Konkan Railway Corporation Ltd.
  • Built-up Area: 61,850 Sq.Ft.
  • Cost: 247.60 Lacs
  • Duration: 29/04/1997 – 28/06/1998
  • Location: Navi Mumbai

We have shown extra ordinary rate of progress for this work. The work was completed amounting Rs.247.60 Lakhs excluding cost of steel and cement. The work consists 4 Buildings of G+3 storied and 1 Building with G+6 storied. Besides these residential building community hall with badminton court and lavish Executive Club.

View Complete Details

Get Best Quote
Yes I'm interested

Cidco Mass Housing 1444 Tenements And Infrastructure Facilities Construction
  • Client: CIDCO of Maharashtra Ltd
  • Built-up Area:
  • Cost: 841.89 Lacs
  • Duration: 14/07/1994 – 13/03/1995
  • Location: Navi Mumbai
  • Architect: Architects Cidco Department
  • Structural Consultant: Cidco

We completed the work in a record time of EIGHT months.The work consists of various items in Building works, U.G. Tank, electrical sub stations with all equipments, asphalted roads, street lights, internal & external electrifications etc. and all such items in huge quantities.

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: CIDCO of Maharashtra Ltd
  • Built-up Area: 53,190 Sq.Ft.
  • Cost: 407.45 Lacs
  • Duration: 01/02/1994 – 31/01/1995
  • Location: Sindhudurg

This is G+2 type structure consists 336 flats The work was entrusted to us with a time limit of 2 years. At the time of foundation ceremony the then Hon. C.M. Shri Sharad Pawar expressed his urgency and requested to complete the project in 12 months. We accepted the challenge and completed the entire work within 12 months. We were awarded 8% of the project cost as BONUS by CIDCO for the feat.

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: Department of Atomic Energy
  • Built-up Area: 70,842 Sq.Ft.
  • Cost: 1,056.00 Lacs
  • Duration: 23/04/2007 – 22/11/2008
  • Location: Mumbai
  • Architect: Department of Atomic Energy
  • Structural Consultant: Department of Atomic Energy

The work consist stilt + 7 upper floor hostel building. The work involved all civil works with exclusive finishing works & allied works such as PH work, electrification, LAN System, Road works.

 

View Complete Details

Get Best Quote
Yes I'm interested

School Construction

Get Latest Price

  • Client: Department of Atomic Energy
  • Built-up Area: 10,142 Sq.Ft.
  • Cost: 114.96 Lacs
  • Duration: 19/09/2007 – 18/06/2008
  • Location:

The work consists Ground + 1 floor school building. The scope of work involved all civil works with PH & Electrification works.

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: NMMC Public Work Division
  • Built-up Area: 34,800 Sq.Ft.
  • Cost: 167.63
  • Duration: 20/02/1997 – 31/12/1998
  • Location: Kankawali

The work was in hilly & backward area at Phondaghar. The work includes huge structural steel work. The work was completed before 3 months of stipulated time.

View Complete Details

Get Best Quote
Yes I'm interested

RCC ESR Construction

Get Latest Price

  • Client: Department of Atomic Energy
  • Built-up Area: 2.40 ML
  • Cost: 314.00 Lacs
  • Duration: 05/10/2009 – 04/11/10
  • Location: Mumbai

This is the specialized work. The work consists RCC elevated Service Reservoirs of 2.40 ML capacity.

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: CIDCO of Maharashtra Ltd
  • Built-up Area:
  • Cost: 852.28 Lacs
  • Duration: 30/05/2005 – 31/01/2007
  • Location: Navi Mumbai

The work consisted of construction of connecting passage, entrance concourse, platform flooring, Polycarbonate roofing, Retaining wall, development in forecourt area, electrical works and other allied works at Khandeshwar Railway Station. The said work was carried out as per procedure defined in ISO 9001-2000 and we have obtain the ISO 9001-2000 certification.

View Complete Details

Get Best Quote
Yes I'm interested

RCC Sewer Line Laying

Get Latest Price

  • Client: CIDCO of Maharashtra Ltd
  • Built-up Area: 8 Km
  • Cost: 109.78 Lacs
  • Duration: 19/07/1996 – 18/03/98
  • Location: Navi Mumbai
  • Architect: --
  • Structural Consultant: --

The location of entire sewerage line is in close proximity of the Thane creek and all works was carried out in slushy marine clay and heavy discharges of under ground water.

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: Indian Institute of Technology Bombay
  • Built-up Area: 1,37,030 Sq.F
  • Cost: 2649.6 Lacs
  • Duration: 11/02/2010 – 10/08/2011
  • Location: Mumbai
  • Architect: Hafeez Contractor
  • Structural Consultant: Dongre Associates

The work consists Stilt + 16 floors having 60 flats. The work involves civil works with internal services like water supply, sewage disposal, internal and external electrifications, Fire Fighting and fire Alarm system, Elevators etc.

 

View Complete Details

Get Best Quote
Yes I'm interested

Additional Spent Fuel Storage & Utility Building Construction

  • Client: Nuclear Power Corporation of India Ltd.
  • Built-up Area: 74,400 Sq.Ft.
  • Cost: 553.30 Lacs
  • Duration: 19/07/2002 – 18/11/2003
  • Location: Rajasthan

The work consisted of Fuel storage & Utility Building of Gr + 4 storied structure in restricted plant area of Rajasthan Power Project. The main features of work is temperature controlled concrete under 19 Deg. Celsius.

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: Bhabha Atomic Research Center
  • Built-up Area: 94,550 Sq.Ft.
  • Cost: 710.11 Lacs
  • Duration: 22/01/2001 – 30/08/2003
  • Location: Mumbai

The location of the site is in restricted plant area of Bhabha Atomic Research Center. The concrete work is only by using RMC and heavy density Hematite concrete. The work includes heavy fabrication works at Mezzanine floors, heavy steel frames, Gantry girders with innumerable angel frames, plates, EPS placed with a very high degree of accuracy. We have executed the structural steel work for tune of 140 MT

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: Bhabha Atomic Research Center
  • Built-up Area: 15,900 Sq.Ft.
  • Cost: 148.00 Lacs
  • Duration: 15/12/2000 – 14/12/2001
  • Location: Mumbai

A prestigious project where the laboratory was designed with special provisions and the office area was well-planned – a judicious mix of aesthetics and functionality. The work consists Ground + 3 storied involves huge structural steel work

View Complete Details

Get Best Quote
Yes I'm interested

  • Client: Department of Atomic Energy
  • Built-up Area: 20,355 Sq.Ft.
  • Cost: 224.15 Lacs
  • Duration: 20/09/2006 – 19/05/2007
  • Location: Mumbai
  • Architect: Department of Atomic Energy
  • Structural Consultant: Department of Atomic Energy

    The work consists Ground + 3 upper floors structure in two blocks of Type -IV buildings. The work involved all civil works with external & Internal PH works, & Electrification work.

View Complete Details

Get Best Quote
Yes I'm interested

Provider of type v-e residential building, el castillo-residential building construction, construction of balance work of 48 flats etc....Read More

Download Brochure

Nature of Business

Service Provider

Year of Establishment

1981

Legal Status of Firm

Private Limited Company

GST Number

27AAACK5108Q1Z8
View Complete Details
Send us a Quick Message!
Tell Us What Are You Looking For?
I agree to the terms and privacy policy
View Mobile Number  to reach us quickly
Tell us what you
need
Receive seller
details
Seal the deal
Save time! Get Best Deal
I agree to the terms and privacy policy