Have a requirement?
Get Best Price
Nature of Business
Service ProviderLegal Status of Firm
Limited Company (Ltd./Pvt.Ltd.)Annual Turnover
Rs. 2 - 5 CroreGST Number
23AAACL3402E2ZAPost Construction Treatment
Get Latest Price
- Drilling / Trenching will be done along with the outer periphery of the building and the same will be filled with termiticide solution of required concentration.
- Drilling will be done along with the inner periphery of the building and the same will be filled with termiticide solution of required concentration.
- Drilling will be done on recommended distance to the existing wooden structures of the building.
- Spray will be done on new wooden structures, if any.
- Spray will be done on the walls of the building.
- Treatment of Electric fixtures.
- Termination of termite tubes “Runways”
View Complete Details
Pre Construction Treatment
Get Latest Price
As per the Indian Standard Specification the above treatment is undertaken in four different stages as the construction work progresses which are as under :
- Backfill in immediate contact with the foundation @ 7.5 liters/sq.mt of vertical surface.
- Junction of wall and floor @ 7.5 liters/sq.mt of the vertical walls.
- Top surface of the plinth filling @ 5 liters/sq.mt of the top surface area.
- External perimeter of the building @ 7.5 liters/sq.mt of the vertical surface.
It is backed up with a service guarantee of 10 Years
View Complete Details
Mosquitoes Control Services
Get Latest Price
LFPL will be doing this treatment having the knock down effect.
The mosquitoes dies immediately. The chemical is safe for human beings
View Complete Details
Stack Fumigation
Get Latest Price
Stack Fumigation with ALP shall be carried out by making enclosure of commodity stacks covering them with fumigation covers. The fumigant used shall be@ 9 gms per Metric Ton, it shall be equally distributed throughout the stack allowing gas concentration in equilibrium. Stack shall remain covered by fumigation sheets with exposure period of 5 or 7 days. This treatment demands that owner shall make the stacks of commodity in such a way so to facilitate the execution of fumigation activities. Some of the key suggestions for effective results are:
- Periphery of stack should have at least 3 feet free space for movement and gap between roofs of godown and stack top should be more than 6 feet.
- Staking on pallets around 100mm above ground and in case height of stack is more than 6 feet we recommend pallatisation
- The frequency recommended is monthly in case stock is retained for period more than 1 month. Regular sampling of long kept stocks shall help us in determining if fumigation is needed before one month.
- Services are provided for warehouses as per NSPM 22 guidelines.
View Complete Details
need
details