Have a requirement?
Get Best Price
Have a requirement?
Get Best Price
Pre Construction Anti-Termite Treatment
Pre Construction Anti-Termite Treatment
Get Latest Price
To properly treat for termites during pre construction, the area will need to have termiticides applied several times at different stages giving guarantee. The first step for pre-construction termite treatment is to treat the slab by treating with a termiticide barrier. Sides & bottom surface of the foundation trenches or column pits are treated with chemical emulsion. The plinth area is treated. Small holes are made at regular intervals in each wall and filled with chemical emulsion and closed finally. The earth around the external perimeter of the building is treated so as to prevent the reinfection of termites from outside
View Complete Details
need
details