Industrial Sewage Treatment Plant, 50 KLD
Capacity (KLD) | 50 KLD |
Feed Flow Rate(m3/day) | 51-100 m3/day |
Impurities to be removed | Oil and Grease, Dissolved Minerals, Color, etc |
Deliver Type | PAN India |
Installation Type | Completes Civil work with Installation |
Operation Process
1. Solid Separation Zone: First stage transforms the effluent solids to settled solids while allowing scum tofloat on the surface; it is a primary sedimentation zone in which settled sludge is stabilized by anaerobic digestion.The treatment efficiency of the chamber is in the range of 30% BOD removal. 2. Aeration Zone:Second stage is the aerobic zone along with fab media inside the tank which in turn increases the surface area and retains microorganisms long enough to digest the organic substance. clear water overflows to the next treatment chamber. Air is provided through blowers and higher contacting time with the slime on the fab media facilitates efficient digestion. bod removal is around 60%3. Final sedimentation Zone:Final stage involves the sedimentation where organic wastes are settled in the sedimentation zone. the settled waste in the bottom of the tank is pumped back to the solid separation zone as a return sludge having active biomass MLSS to increase the efficiency of the system and to ensure that the effluent quality meets the stipulated PCB standards.
Product Details
Company Details
Product Specification
Capacity (KLD) | 50 KLD |
Feed Flow Rate(m3/day) | 51-100 m3/day |
Impurities to be removed | Oil and Grease, Dissolved Minerals, Color, etc |
Deliver Type | PAN India |
Installation Type | Completes Civil work with Installation |
Warranty | 1 Year |
I Deal In | New Only |
Air Blower Count | 2 |
Control Module | Available |
Country of Origin | Made in India |
Product Description
Operation Process
1. Solid Separation Zone:
First stage transforms the effluent solids to settled solids while allowing scum tofloat on the surface; it is a primary sedimentation zone in which settled sludge is stabilized by anaerobic digestion.
The treatment efficiency of the chamber is in the range of 30% BOD removal.
2. Aeration Zone:
Second stage is the aerobic zone along with fab media inside the tank which in turn increases the surface area and retains microorganisms long enough to digest the organic substance. clear water overflows to the next treatment chamber. Air is provided through blowers and higher contacting time with the slime on the fab media facilitates efficient digestion. bod removal is around 60%
3. Final sedimentation Zone:
Final stage involves the sedimentation where organic wastes are settled in the sedimentation zone. the settled waste in the bottom of the tank is pumped back to the solid separation zone as a return sludge having active biomass MLSS to increase the efficiency of the system and to ensure that the effluent quality meets the stipulated PCB standards.
Product Video
About the Company
Our client-centric approach and sincere effort have enabled us to carve a niche in this sector. We have chosen an adroit team of quality supervisors that value the quality of our provided tank and RO plant at each stage of designing to make sure that the norms are effectively met. Utilizing these facilities and our qualitative working approach, we have been able to perform all tasks and to bring forth outcomes with flawless properties.
Seller Contact Details
Natunhat, Danga Kazipara, Kalitala, Bonhooghly, Sonarpur, No. 24 ,uttardanga, Boral Kolkata - 700033, West Bengal, India
Get Directions