Boiler-Turbine-Generator (BTG Packages)
BTG represents ‘the heart’ of Power Plant and the core Power Plant parameters like Turbine heat rate, Boiler efficiency, Station Heat rate and auxiliary power consumption are decided in the choice of BTG.
All major powergen companies in the world typically focus on Boiler, Turbine and Generator Island. DFPS offers BTG package from 40 MW to 350 MW which has found immediate acceptance by clients.With increasing tariff competition, Organizations are looking for optimum solutions, the constraint however being that preferred Boiler or Turbine Supplier may not be the part of offered EPC Package. This often leaves clients with a handicap of not being able to choose best techno-commercial equipment. Clients are increasingly choosing:
- Flexibility to choose best evaluated Boiler and Turbine.
- Flexibility to split power plant into 2 – 3 selective package to reduce project costs significantly without enhancing risks.
* Flexibility to have fixed project costs without escalation.
* Flexibility to have fixed project schedule with lesser risk of time over run.
* Flexibility to award single point responsibility – where it matters most –BTG and BOP.
Product Details
Company Details
Product Description
BTG represents ‘the heart' of Power Plant and the core Power Plant parameters like Turbine heat rate, Boiler efficiency, Station Heat rate and auxiliary power consumption are decided in the choice of BTG.
All major powergen companies in the world typically focus on Boiler, Turbine and Generator Island.
DFPS offers BTG package from 40 MW to 350 MW which has found immediate acceptance by clients.
With increasing tariff competition, Organizations are looking for optimum solutions, the constraint however being that preferred Boiler or Turbine Supplier may not be the part of offered EPC Package. This often leaves clients with a handicap of not being able to choose best techno-commercial equipment.
Clients are increasingly choosing:- Flexibility to choose best evaluated Boiler and Turbine.
- Flexibility to split power plant into 2 – 3 selective package to reduce project costs significantly without enhancing risks.
- Flexibility to have fixed project costs without escalation.
- Flexibility to have fixed project schedule with lesser risk of time over run.
- Flexibility to award single point responsibility – where it matters most –BTG and BOP.
About the Company
The rapid growth in the power generation sector post Electricity Act 2003 has opened up opportunities TDPS was ideally positioned to undertake forward integration and offer complete BTG /EPC Solutions.
DFPS has association with Dongfang Turbine Company for 50 MW to 300 MW and with Wuxi upto 300 MW Circulating Fluidized Bed Combustion (CFBC) Boilers and Pulverized Combustion Boiler(PC) for pressure parts, Thermal and Combustion design.
In a span of just 4 years since inception in 2007, has bagged over Rs. 1,500 Crores of orders, for building Boiler-Turbine-Generator (BTG) packages, heart of thermal power plant, ranging from 50 MW to150 MW, reflecting the trust placed by its clients.
The early acceptance of the clients lay in the unique value proposition that DFPS offersnamely 'BOB' 'Best of Both philosophy. DFPS draws upon on the rich experience of over 800 numbers Circulating Fluidized Bed combustion (CFBC) Boilers and over 750 numbers PC Boilers of its overseas associates in designing Boiler Combustion furnaces and manufacturing pressure parts.
Seller Contact Details
No. 37, 7th Cross, Vasanth Nagar, Mumbai - 560001, Maharashtra, India