The use of factory pre-fabricated insulated panels has helped to speed up the completion period and simplified the site work involved in the older, masonry shell-with-fieldapplied-insulation type of construction.
The puf panels are formed by injecting polyol, isocyanide and a foaming agent between two metal sheets in a mould which is then held tight in a heated press for curing. The vertical edges of the panel are moulded in a tongue-and-groove fashion with a locking system, referred to as 'camlock', foamed in a place along the panel edges. Maximum length of the panel depends on the length of the mould and press available with the manufacturer and is restricted to 6 metres with indian companies at this time.
150/A, Bileshwar Industrial Estate
Kathwada Road
Ahmedabad - 380015, Gujarat, India
Have a requirement?
Get Best Price
Have a requirement?
Get Best Price