X
I agree to the terms and privacy policy

Zonap Engineering Solutions Private Limited

Pune, Maharashtra

| GST  27AAACZ9865H1ZO

| TrustSEAL Verified

View Mobile Number 87% Response Rate

Home

> Products & Services

> Lapping And Polishing Machine

Lapping And Polishing Machine

Prominent & Leading Manufacturer from Pune, we offer Lapping And Polishing Machine.

Lapping And Polishing Machine
Interested in this product?
Get Best Quote

Lapping And Polishing Machine

Rs 50 Lakhs / UnitGet Latest Price

Minimum Order Quantity: 1 Unit

Automation GradeFully-automatic
BrandZonap
MaterialMild Steel
Size of upper plate1070x495x45 mm (ODxIDxT)
Size of lower plate1070x495x45 mm (ODxIDxT)
Min thickness of workpiece0.6 mm
Max size of work piece280 mm diagonal
The lower grinding disc speed10-80rpm(stepless regulation)
The upper grinding disc speed8-50rpm(stepless)
The sun wheel speed5-35rpm(stepless)
Gear speed3-35rpm(stepless)
The motor of lower plate15Kw, rated speed 1440 rpm
The motor of upper plate11Kw, rated speed 1440rpm
The motor of sun wheel and inner gear3Kw, rated speed 1430rpm
Overall dimension2500x2000x3000 mm
Total weight9000 kg

Main purposes:- This equipment is mainly used for grinding and polishing both sides of the parallel surface of thin metal and hard brittle nonmetal parts, such as valve plate, friction plate, oil pump blades and sapphire etc.

Technical characteristic:
  • It uses Gantry structure, with good stability and strong rigidity.
  • Maximum pressure is 1500 kg, with double oil cylinder, precisely control of pressure by electro-hydraulic proportional valve.
  • Upper tray adopts 304 stainless steel, strong corrosion resistance.
  • Both the upper and lower plates are equipped with cooling-heating structure, The surface temperature is controllable.
  • The speed of the sun gear, inner gear ring, the upper and lower plates can be adjusted independently, and the overall speed can match each other.


Additional Information:

  • Item Code: Lapping
  • Production Capacity: As per the requirements
  • Delivery Time: 2-3 months
  • Packaging Details: Standard packing

View Complete Details

Yes I'm interested
© Zonap Engineering Solutions Private Limited. All Rights Reserved (Terms of Use)